Process Simulation, Cost Estimation and Optimization …
dimensioning and cost estimation of CO 2 capture from a cement plant with the use of Aspen HYSYS. MEA was the sorbent, and the amine package in Aspen HYSYS was applied. Capture rate, energy demand per kg CO 2 captured, and capture cost per ton CO 2 were calculated. The base case had a CO 2 removal efficiency of 90 %.